A Case Study

TURNKEY SOLUTIONS
PROVIDING THE TURNING POINT FOR WAREHOUSE EXPANSION
THE
SOLUTION
CTK USA Logistics is a full-service logistics company offering customized, cost-efficient fulfillment services. Based out of Ontario, CA and backed by 20 years of experience, CTK Logistics combines logistics expertise with an in-house marketing and sales team, using this proficiency to support the growth of businesses of all sizes through tailored fulfillment strategies and exceptional service.



THE
SITUATION
Nucor Warehouse Systems (NWS), the largest pallet rack manufacturer in North America and a complete integration solutions provider, was the partner that CTK was looking for to support a project of this scope. With turnkey warehouse solutions, NWS is an expert in the storage solutions space and would provide the value of ease, efficiency, and impeccable quality of service.

The NWS engineering team immediately began designing a cost-effective solution that would meet stringent seismic requirements while maximizing available space. NWS value-engineered the project with a standardized design, simplifying installation and future maintenance while keeping costs down. To fully utilize new warehouse’s height, especially in a seismic zone, the NWS team optimized the elevation profiles of the rack and designed the layout in a way that incoming pallets could be brought to storage without any repalletizing, streamlining CTK’s workflow. NWS also managed permitting and inspections, delivering a true turnkey solution to the customer.
A major challenge during this project was a shorter than expected build-out timeline due to access to the new warehouse being pushed to a later date. This compressed the initial 6-week installation timeframe to less than a month. However, the standardized design proved its value, with NWS’ installation team completing the project on schedule and saving CTK any additional costs from extending its old lease.
THE
RESULT
The results exceeded expectations. CTK now operates a new fully code-complaint, 20,000 pallet position system that maximizes the building’s vertical space while meeting rigorous seismic standards. Due to NWS’ strategic design method, the team was able to expedite the installation process to meet the accelerated deadline, avoiding the CTK team of any additional costs from lease extension and operational disruptions. Execution of this project was done safely, on budget, and on-time.
CTK now has a scalable, compliant and streamlined warehouse that will serve it and its customers for years to come.